Safety assessment

ARP 4761 Safety Assessment Support

A structured safety assessment path from Functional Hazard Assessment through PSSA and SSA, with traceable assumptions and design mitigations.

SAE ARP4761SAE ARP4754AEUROCAE ED-135

Scope of support

What the engagement can cover.

Scope is tailored to the certification basis, current lifecycle state and evidence already available.

  1. 01

    Functional Hazard Assessment

  2. 02

    Preliminary System Safety Assessment

  3. 03

    System Safety Assessment

  4. 04

    Fault Tree and Common Cause Analysis

  5. 05

    Failure Modes and Effects Analysis

  6. 06

    Safety-derived requirement traceability

Typical outputs

FHAPSSASSASafety traceability review

Training & working sessions

From standard text
to project decisions.

Modules combine standards context with the documents, reviews and evidence choices teams make during delivery.

Module 01

Safety lifecycle

Failure conditions, classifications and safety objectives.

Module 02

Analysis methods

FHA, FTA, FMEA and common-cause techniques.

Module 03

PSSA to SSA

Architecture assumptions, mitigations and verification evidence.

Module 04

Development integration

How safety results drive ARP 4754A, DO-178C and DO-254 assurance.

Instructor assignments and any claimed program history are provided only after internal approval and verification.

Engagement scoping

Information that makes the first review useful.

No compliance outcome is promised from a website form. Scope begins with the program facts and evidence that can actually be reviewed.

01

Applicable basis

Standard revision, authority or customer basis, assurance level and agreed means of compliance.

02

Lifecycle state

Current milestone, approved plans, baselines, open findings and target review date.

03

Requested boundary

Training, gap analysis, document review, evidence recovery or audit-readiness support.

FAQ

Questions before the first workshop.

What assigns a DAL?+

Development assurance levels are informed by the system safety process and failure-condition classification, then allocated through the system architecture.

Can existing safety analyses be reviewed?+

Yes. A review can focus on assumptions, completeness, consistency, traceability and alignment with the current architecture.

Start with a technical conversation

Make your ARP 4761 evidence easier to defend.

Tell us the standard, lifecycle stage and evidence challenge. We will help frame a focused next step.

info@heraklet.com ↗

We use your details only to respond to this request.